SR 7 Extension
You must have the Adobe® Acrobat® Reader properly installed on your computer in order to view and print the following documents. If you do not have Adobe® Acrobat® Reader , download a free copy here. Please follow the manufacturer's instructions for installing and using this software. Some of these files are large and may take several minutes to download.
S.R. 7 EXTENSION PROJECT UPDATES
VIRTUAL PUBLIC MEETING FEBRUARY 24, 2026 AND IN-PERSON PUBLIC MEETING FEBRUARY 26, 2026
Archived Project Documents (These documents have been archived for reference and research purposes.)
- Virtual Comment Form
- In-person Comment Form
- Public Meeting Flyer
- Public Meeting Map
- State Road 7 Fact Sheet
- Project Facts
- In-Person Presentation
- Virtual Presentation
- Exhibits
- Understanding Noise Walls - Video
- Virtual Meeeting Recording
VIRTUAL DESIGN PUBLIC WORKSHOP JANUARY 28, 2021
- January 28, 2021 Virtual Public Workshop from 1:00 p.m. to 3:00 p.m.
- January 28, 2021 Virtual Public Workshop from 5:30 p.m. to 7:30 p.m.
- Workshop Presentation
- Comment Form
- Virtual Public Workshop Flyer
Comments and Questions can also be sent through the website via the Email Updates Page.
BIDDABILITY PLANS
22966465201 – 60th to Northlake
22966475201 – Okeechobee to 60th
SR 7 Project Presentation to Palm Beach County TPA
PD&E STUDY TECHNICAL DOCUMENTS & PUBLICATIONS
Finding of No Significant Impact (FONSI)/Environmental Assessment (EA)
- SR 7 Signed FONSI/EA
- Appendix A: Planning Consistency Checklist Revised
- Appendix B: AN Package and Responses
- Appendix C: ETDM Summary Report
- Appendix D: Correspondence
- Appendix E: Coordination Meetings
- Appendix F: Alternative Concept Plans
- Appendix G: Intersection Needs at Okeechobee
- Appendix H: Existing Right of Way Ownership
- Appendix I: Conceptual Mitigation Plan
- Appendix J: Typical Sections for Recommended Alternative
- Appendix K: Section 4(f) De Minimis Supporting Materials
- Appendix L: Ibis Zoning Resolution
- Appendix M: Sociocultural Data Report
- Appendix N: Corridor Report Addendum
Design Traffic Report
Section 4(f) Determination of Applicability
Corridor Report
- Corridor Report
- Appendix A: SR 7 Corridor Designation and Planning Report
- Appendix B: SR 7 Corridor Extension Feasiblity Study
- Appendix C: Advance Notification Responses
- Appendix D: Public Officials Agency Kickoff Meeting Minutes
- Appendix E: Agency Corridor Workshop Meeting Minutes
- Appendix F: Agency Coordination Meeting Minutes
- Appendix G: ETDM Summary Report
- Appendix H: ETDM Meeting Minutes
- Appendix I: LRE Cost Estimates
Other Technical Documents
- Air Quality Technical Memorandum
- Biological Opinion from US FWS
- Conceptual Mitiagion Plan
- Contamination Screening Report
- Cultural Resources Assessment Survey
- Endangered Species Biological Assessment
- Locaiton Hydraulics Report
- Noise Report
- Pond Siting Report
- Preliminary Engineering Report
- Value Engineering Report
- Wetland Evaluation Report
FDOT Informational Brochures
- Context Sensitive Solutions
- ETDM Process
- PD&E Studies
- Public Involvement: Get Involved
- Traffic Analysis
- Traffic Noise
Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status.

